01 Land
Sites we buy outright
Our model is to own the ground under every campus, with room for generation, halls and later phases. The first purchase, the 6.6 GW Bluebonnet I site, closes in November 2026.
Emerging global data center developer
Simorphic is building campuses where one company owns every layer: the land, the behind-the-meter generation, the data center and the servers and chips inside it. One owner, accountable from the ground to the GPU.
Land. Power. Compute. One owner.
Status, November 2026: six campuses in planning. Bluebonnet I (6.6 GW) closes this month.
Simorphic by the numbers, November 2026
Global Energy Council
Simorphic's internal site team, led by Adnan Mortada. Over the past 12 months it has sourced more than 60 GW of potential sites worldwide for Simorphic to evaluate.
Global Equipment Council
Simorphic's internal team for long-lead generation equipment. It has 650 MW of gas turbines already secured or being processed for deployment in 2027. None of that first capacity is committed to a customer yet, so it is open for offtake.
The platform
Demand for compute is contracted years ahead. What limits delivery is power. Simorphic is organized around that constraint. Our model is to own the land, the generation, the data center and the IT equipment, so no layer of the stack waits on another company.
01 Land
Our model is to own the ground under every campus, with room for generation, halls and later phases. The first purchase, the 6.6 GW Bluebonnet I site, closes in November 2026.
02 Power
Behind-the-meter plant sized to the campus, designed with contracted fuel and redundancy from the first megawatt.
03 Data centers
High density halls designed for liquid cooled AI and cloud loads, delivered in phases that track the generation coming online.
04 Compute
The plan includes the IT equipment too: servers, accelerators, networking and storage, to be installed and run by the same team that runs the plant.
How the power worksHow we plan to offer capacityPeople and place
Sites, worldwide
Simorphic is planning campuses in the United States, South America and Central Asia. Five of the six run on behind-the-meter power, which widens the map because a site no longer needs spare grid capacity to qualify. Virginia is grid connected. In South Texas, Simorphic is closing on the 6.6 GW Bluebonnet I site in November 2026 and holds an exclusive option on the 3.3 GW Bluebonnet II site.
Drag to rotate. Select a site to fly to it.
Five sites are planned on behind-the-meter power. Virginia connects to the grid. All six are in planning. Shaded areas mark regions where the location has not been announced.
Deployment timeline
With the land, the generation equipment and the hardware under one owner, detailed design, equipment and commissioning can run side by side instead of one after another. This is a target, not a delivered result. It is informed by our engineering and design partners, who have delivered more than 7 GW over their careers.
Stories of our team
Simorphic's team members have built in every kind of weather, and our engineering and design partners have delivered more than 7 GW over their careers. The only continents missing from the list are Australia and Antarctica.
That is the combined record of our engineering and design partners over their careers, and it is the experience behind our plans.
Rain, snow or sunshine. Schedules get built around the conditions on the ground, because the team has worked through all of them.
We have even seen electromigration, which is not a good thing. Unless you are an electron looking to move.
Responsibility
A developer that owns its generation cannot point to someone else on emissions, water or noise. These are the principles we commit to design to.
Community
Our behind-the-meter campuses are designed so the campus does not add its full load to the grid that serves its neighbors.
Water
Cooling systems are chosen for each site with water use as a design constraint from the start.
Emissions
We plan modern, efficient generation with current emissions controls, and layouts that leave room to add lower carbon sources over time.
Safety
A single safety program covers construction and operations for both the generation and the data center.
Partner with Simorphic
Tell us the load, the timeline and the region. The first 650 MW of planned capacity is open for offtake.