Solutions

Capacity on land, power and equipment under one owner

How we plan to offer capacity, what changes when one company owns every layer, and what we look for in a site.

Solutions

How we plan to offer capacity

Each option is designed to run on land, power and equipment that Simorphic owns, so fewer outside parties sit between a customer and the delivery date.

Dedicated compute

Simorphic-owned servers, reserved for you

Clusters of our servers and accelerators, powered and operated by us and committed to a single customer.

Build to suit

A campus designed around your load

Halls, cooling, power topology and IT equipment specified to your workload, all owned and operated by Simorphic under a long-term agreement.

Turnkey capacity

Ready capacity on a committed date

Energized halls with equipment installed, covering power, cooling, hardware and operations in one agreement.

  1. Site and fuel

    Land purchased, with fuel supply, water and air permits secured as one package.

  2. Owned generation

    Plant sized to the campus and built in phases.

  3. Campus and compute

    Halls energize and our servers go in as each generation block comes online.

  4. Operations

    Plant, facility and hardware run under a single service commitment.

Why Simorphic

What changes when one company owns every layer

Speed to power

On behind-the-meter campuses the schedule depends on equipment and permits we control, not on a place in a utility queue.

Certainty

Delivery dates rest on assets under one owner, without handoffs between a landowner, a power provider, a landlord and a hardware vendor.

Cost visibility

Owned generation with contracted fuel gives a view of energy cost across the full lease term.

Scale in phases

Modular generation lets a campus start at the size a tenant needs and expand without redesign.

Reliability by design

Redundancy is built into the plant and the private bus, and one operations team runs everything from the turbines to the racks.

A lighter grid footprint

A campus that brings its own power draws far less on the grid capacity that local households and businesses rely on.

For landowners

What we look for in a site

Simorphic buys the land it builds on. Behind-the-meter power widens the map, because a site does not need spare grid capacity to qualify.

Land

Contiguous acreage with room for generation, halls and expansion phases.

Fuel

Proximity to firm fuel supply with capacity for long-term contracts.

Fiber

Diverse long-haul routes within reach of the site.

Water and cooling

A cooling design matched to local water availability.

Permitting

A clear path for air, land use and construction approvals.

Community

Local support for the jobs, tax base and infrastructure a campus brings.

Need capacity with its own power behind it?

Tell us the load, the timeline and the region. The first 650 MW of planned capacity is open for offtake.