Power

Private power, owned by the developer

On our behind-the-meter campuses the generation is part of the project, not a utility request. This page explains how it is designed.

92%of North American capacity under construction is already committedJLL, 2026
~90 GWof behind-the-meter data center power tracked in the USCleanview, mid 2026
~2 GWof that is operating, across four projectsCleanview, mid 2026
73.6 GWlive IT capacity forecast worldwide for 2026, up from 60.0 GW in 2025Knight Frank, 2026

The power stack

Private power, engineered as the primary supply

Grid interconnection is now the longest line on a campus schedule. Simorphic moves that line inside the fence. On our behind-the-meter campuses, onsite generation is the primary supply, not the backup, and it is permitted and built on the same timeline as the halls.

Because one company will own the land, the plant and the IT equipment, a customer deals with one contract, one counterparty and a long-term view of cost.

SIMORPHIC-OWNED LAND: POWER, HALLS AND IT BEHIND THE METER Fuel supplycontracted Generationowned, N+1 Storageride through Switchgearprivate bus Data hall Aowned servers Data hall Bowned servers Data hall Cowned servers M Utility grid: optional backup or export
Prime generationDispatchable onsite generation selected for each site and fuel source, built in modular blocks so capacity energizes in phases.
Storage and qualityBattery storage and power conditioning to ride through transients and smooth the fast load swings of AI training.
RedundancySpare generation blocks and a private distribution bus, so maintenance or a unit trip does not reach the IT load.
Grid, where usefulOn behind-the-meter campuses a utility tie is an option for backup or export. Where the grid is the better answer, as at our Virginia site, we connect to it.

The behind-the-meter execution gap

US behind-the-meter data center generation by project status, MW. 59 projects tracked by Cleanview, mid 2026. About 2% of what has been announced is running, which is why owning and delivering the plant matters.

Need capacity with its own power behind it?

Tell us the load, the timeline and the region. The first 650 MW of planned capacity is open for offtake.