Power
Private power, owned by the developer
On our behind-the-meter campuses the generation is part of the project, not a utility request. This page explains how it is designed.
The power stack
Private power, engineered as the primary supply
Grid interconnection is now the longest line on a campus schedule. Simorphic moves that line inside the fence. On our behind-the-meter campuses, onsite generation is the primary supply, not the backup, and it is permitted and built on the same timeline as the halls.
Because one company will own the land, the plant and the IT equipment, a customer deals with one contract, one counterparty and a long-term view of cost.
The behind-the-meter execution gap
US behind-the-meter data center generation by project status, MW. 59 projects tracked by Cleanview, mid 2026. About 2% of what has been announced is running, which is why owning and delivering the plant matters.
Need capacity with its own power behind it?
Tell us the load, the timeline and the region. The first 650 MW of planned capacity is open for offtake.